Lines Matching refs:smaller
89 then, if the scheduling deadline is smaller than the current time, or
356 If, instead, the total utilization is smaller than M, then non real-time
363 maximum tardiness of each task is smaller or equal than
379 of the tasks running on such a CPU is smaller or equal than 1.
383 running on such a CPU is smaller or equal than 1:
404 such a time with the interval size t. If h(t) is smaller than t (that is,
406 smaller than the size of the interval) for all the possible values of t, then
429 period smaller than the one of the first task. Hence, if all the tasks
432 smaller than the absolute deadline of Task_1, which is t + P). As a
455 As seen, enforcing that the total utilization is smaller than M does not
458 a total utilization smaller than M is enough to guarantee that non real-time
463 the total utilization is smaller or equal than M then the response times of
563 is smaller than M. When talking about -deadline tasks, this requires that
564 the sum of the ratio between runtime and period for all tasks is smaller
673 -deadline tasks cannot have an affinity mask smaller that the entire