Lines Matching full:availability
12 4. OPP Availability Control Functions
67 Note on OPP Availability
85 WARNING: Users of OPP library should refresh their availability count using
98 operation. The SoC framework can subsequently control the availability of the
104 is assumed to be available and control of its availability can be done
143 availability. This function is especially useful to enable an OPP which
201 4. OPP Availability Control Functions
205 availability of a OPP within the OPP list. This allows SoC frameworks to have
330 | |- opp 1 (availability, freq, voltage)
345 represent an OPP. In addition to the freq, voltage, availability
354 dev_pm_opp_add, but the availability of the OPP can be modified