Searched full:schedules (Results 1 – 25 of 132) sorted by relevance
123456
113 * a KFD BO and schedules a job to move the BO.145 * Drops the mm_struct reference and RCU schedules freeing up the fence.
193 /* Schedules work which acquires and releases the rtnl lock. */ in virt_wifi_scan_result()207 /* Schedules work which acquires and releases the rtnl lock. */ in virt_wifi_cancel_scan()279 /* Schedules an event that acquires the rtnl lock. */ in virt_wifi_connect_complete()294 /* Schedules an event that acquires the rtnl lock. */ in virt_wifi_cancel_connect()
75 * This schedules the session protection, and waits for it to start
63 4.20.03 - Rename version to coincide with new release schedules
7 * In all cases we can get better schedules out of the compiler if we hide
85 ohci_dbg (ohci, "stopping schedules ...\n"); in ohci_rh_suspend()271 /* maybe turn schedules back on */ in ohci_rh_resume()292 ohci_dbg (ohci, "restarting schedules ... %08x\n", enables); in ohci_rh_resume()
16 * - async and periodic schedules, shared by HC and HCD ... these
13 * - async and periodic schedules, shared by HC and HCD ... these
98 Schedules and reservation status are available at the Google `doc
132 * schedules that depend on the day of the week. in wilco_ec_rtc_write()
168 * ptep_modify_prot_start() does a pte_update() which does or schedules in __pte_flags_need_flush()
131 * value to hardware as the watchdog core schedules one in intel_oc_wdt_setup()
213 * async_trigger_callback - schedules the callback function to be run
91 c. The upcall handler schedules a worker to dispatch I/O requests.
124 * pulse/space duration for the raw ir decoding state machines, schedules222 * ir_raw_event_handle() - schedules the decoding of stored ir data
405 - The interrupt handler schedules NAPI.420 - The interrupt handler schedules NAPI.
483 * For a HARDWARE SCHEDULER, a scheduler instance schedules jobs from557 * @work_tdr: schedules a delayed call to @drm_sched_job_timedout after the
144 * This schedules removal of SMBus companion device. We have to do
167 * to 0 schedules the rcu destruction. Caller must guarantee locking.
170 * LED classdev 'brightness_get' function. This schedules work
174 days, according to the schedules of the stable team members.
283 /* Schedules CDMA update. */ in job_complete_callback()
175 * all over the place. key_put() schedules this rather than trying to do the
10 * There is one global BPF queue and the central CPU schedules all CPUs by