Lines Matching full:scheduled
180 scheduled call is completed.
237 previously scheduled invocation.
286 same time a next invocation of the same callout is also scheduled, then
319 it is cancelled before the new invocation is scheduled.
337 the callout is scheduled to execute after
350 arguments provide more control over the scheduled time including
352 specifying the precision of the scheduled time,
354 The callout is scheduled to execute in a time window which begins at
365 allows the callout subsystem to coalesce callouts scheduled close to each
540 timeout should be run and the precision of the scheduled run time
783 function invocation was scheduled.